top of page

Facilities and services

Whatever cargo you want to ship – containerized or conventional, bulk or break-bulk, frozen or liquid – we can handle it. We have the equipment, know-how and expertize to do it in the most efficient way.

Discover new possibilities with us!

Container Terminal

In 2023, the terminal handled a record 6.27 million TEUs of cargo, including 494 062 TEUs of containers.

In 2023, KKT consistently implemented its investment plan and invested around EUR 20 million in terminal expansion, infrastructure improvements and new handling equipment. In 2023, KKT received the most powerful Liebherr cranes in the Baltics, which can handle up to 300 tonnes of cargo at a time, as well as the renewal of the port's fleet of tugboats and the purchase of 4 new units of this equipment. 

The terminals have a 500 kW solar power plant installed on the warehouse roofs. Thanks to this investment, the terminal is now also supplied with electricity from renewable sources.

Services
  • Handling all types of containers

  • Services to reefer units

  • Stripping and stuffing (CFS)

  • Storage and weighing, VGM

  • Container depot services

  • Electronic reporting, EDI

Capacity

Berths

143 / 143a

Address & coordinates

Perkelos  8, Klaipeda 

 

55.642916, 21.157426

700 000 TEU  per year

600 000 TEU  per year

Intermodal possibilities

About 15% of all containers arrive and leave the terminal by railway. It is a convenient, safe and fast mode of transport to Belarus, Russia, Ukraine and Kazakhstan. A modern RTG crane is used for efficient railway operations.

Container trains

Berths 

Cranes

Storage

Length: 820 m

Draft: 13.4 m 

Max. ship length: 360 m

4 STS (2x40 t, 2x65 t)

2 mobile (154 t)

9 RTG (40 t)

Container yard: 26,000 TEU

Warehouses: 24,000 sq. m.

Premises

32 ha

4 railway tracks / 100 wagons

600 reefer plugs

Anchor 1
Ro-Ro ir genralinių krovinių terminalas

Ro-Ro & General Cargo Terminal

In 2023, the terminal handled 776 000 t of cargo. The main cargoes consisted of bulk and packaged general cargo, such as timber, fertilisers, agricultural produce and oversized cargo such as coils or wind turbines.

In 2023, the TT-Line Ro-Ro terminal handled 318 ferries, an increase of 11.6% compared to 2022.

Services
  • Handling of ro-ro and general purpose vessels

  • Stevedoring of bulk and break-bulk cargo

  • Bagging bulk cargo and loading to containers

  • Packing, weighing, consolidation of shipments

  • Handling of OOG cargo and heavy loads

  • Storage and warehousing

Address & coordinates

Minijos 180, Klaipeda

55.656305, 21.162271

Berths

127 / 128

Capacity

1 500 000 mt  per year

Berths

Length: 2 x 260 m

Draft:

  • Berth 127 - 9.8 m

  • Berth 128 - 13.4 m

Max. ship length: 230 m

Equipment

Crane GOTTWALD G HMK 5506 (125 t)

Crane LIEBHERR LHM 320 (104 t)

Wagon unloading transporters: 2
Hydraulic loaders: 6

Bulk packing equipment

Storage facilities

Storage yard: 20,000 sq. m.

Warehouses: 36,000 sq. m.

Let’s communicate

Send us a message

TT-Line ro-ro service

Join the team

Call us

© 1994 - 2018 JSC KLAIPEDOS KONTEINERIU TERMINALAS

© 2018 KLAIPEDOS TERMINAL GROUP All rights reserved 

Minijos st. 180, LT-93269 Klaipeda, Lithuania

TT-Line ro-ro service

The line‘s ro-pax ferries provide transportation of vehicles and passengers between Klaipeda and Trelleborg (Sweden) as well as transit from Trelleborg to Rostock and Travemünde in Germany.

Currently the line offers six departures per week from KCT Ro-Ro terminal (Minijos str. 180). From April, another route to Karslhamn, Sweden will be opened.

Address

Minijos 180, Klaipeda

Berths

127 / 128

Capacity

Marco%20Polo240120_edited.jpg

1 500 000 mt  per year

bottom of page