
Facilities and services
Whatever cargo you want to ship – containerized or conventional, bulk or break-bulk, frozen or liquid – we can handle it. We have the equipment, know-how and expertize to do it in the most efficient way.
Discover new possibilities with us!
Container Terminal
In 2025, the terminal handled 6.8 million tons of various cargo, including 491,277 TEU containers.
In 2025, KCT consistently implemented its investment plan and purchased new cargo handling equipment and modernized its infrastructure for nearly €6 million. The terminal invested nearly €2 million in new cargo handling equipment, purchasing eight Linde forklifts, ten port tractors, a container handler (rotator), one Volvo wheel loader, and other smaller cargo handling equipment. This is currently a record amount of equipment in the terminal's history: since the start of operations, KCT has never had such a large amount of handling equipment in its fleet.
EUR 4 million was invested in the renovation of the Ro-Ro and general cargo terminals. In 2025, a new warehouse for bulk cargo with a total area of 2,800 square meters was added. The new infrastructure ensures modern cargo storage conditions, greater flexibility in planning cargo flows, and an even better response to customer needs.
Services
-
Handling all types of containers
-
Services to reefer units
-
Stripping and stuffing (CFS)
-
Storage and weighing, VGM
-
Container depot services
-
Electronic reporting, EDI
Capacity
Berths
143 / 143a
Address & coordinates
Perkelos 8, Klaipeda
55.642916, 21.157426
700 000 TEU per year
600 000 TEU per year
Intermodal possibilities
About 15% of all containers arrive and leave the terminal by railway. It is a convenient, safe and fast mode of transport to Belarus, Russia, Ukraine and Kazakhstan. A modern RTG crane is used for efficient railway operations.
Container trains
Berths
Cranes
Storage
Length: 820 m
Draft: 13.4 m
Max. ship length: 360 m
6 STS (4x65 t; 2x40 t)
2 mobile (154 t)
11 RTG (40 t)
Container yard: 23,500 TEU
Warehouses: 23,750 sq. m.
Premises
32 ha
4 railway tracks / 100 wagons
600 reefer plugs
Ro-Ro & General Cargo Terminal
In 2025, the terminal handled over 2 million tons of cargo, with the majority consisting of bulk and packaged general cargo, such as timber, fertilizers, agricultural products, and large-scale items like reels and wind turbines.
In 2025, 344 TT-Line ferries were handled at the Ro-Ro terminal, which is 15 less than in 2024, when 359 ferries were handled.
Services
-
Handling of ro-ro and general purpose vessels
-
Stevedoring of bulk and break-bulk cargo
-
Bagging bulk cargo and loading to containers
-
Packing, weighing, consolidation of shipments
-
Handling of OOG cargo and heavy loads
-
Storage and warehousing
Address & coordinates
Minijos 180, Klaipeda
55.656305, 21.162271
Berths
127 / 128
Capacity
1 500 000 mt per year
Berths
Length: 2 x 260 m
Draft:
-
Berth 127 - 9.8 m
-
Berth 128 - 13.4 m
Max. ship length: 230 m
Equipment
Crane GOTTWALD G HMK 5506 (125 t)
Crane LIEBHERR LHM 320 (104 t)
Wagon unloading transporters: 2
Hydraulic loaders: 6
Bulk packing equipment
Storage facilities
Storage yard: 143,364 sq. m.
Warehouses: 33,600 sq. m.
Let’s communicate
Send us a message
TT-Line ro-ro service
Join the team
Call us
© 1994 - 2018 JSC KLAIPEDOS KONTEINERIU TERMINALAS
© 2018 KLAIPEDOS TERMINAL GROUP All rights reserved
Minijos st. 180, LT-93269 Klaipeda, Lithuania
TT-Line ro-ro service
The line‘s ro-pax ferries provide transportation of vehicles and passengers between Klaipeda and Trelleborg (Sweden) and Karslhamn, also to Travemünde in Germany.
Currently the line offers six departures per week from KCT Ro-Ro terminal (Minijos str. 180):
- 2 times a week to Trelerborg, Sweden;
- 3 times a week to Karslhamn, Sweden;
- 3 times a week to Travemünde, Germany.
Address
Minijos 180, Klaipeda
Berths
127 / 128
Capacity
